Industrial regions require a rapid transition to clean energy to secure long-term economic resilience and remain competitive in a global market shaped by decarbonisation targets.
However, current whole-of-system energy planning approaches do not facilitate the rollout of renewable energy at the scale or pace required by these industrial regions. Modelling approaches that inform whole-of-system plans, such as the Australian Energy Market Operator’s (AEMO) Integrated System Plan (ISP), lack the mandate to capture detailed regional and facility-level information needed to support this transition.
To provide the certainty that industry and renewable developers need to bring forward investment, top-down modelling, such as that used to inform AEMO’s ISP, can be complemented by regional energy planning approaches. This issues paper details what a coordinated approach to regional energy planning could look like for Central Queensland through an Industrial Precinct Energy Plan (IPEP). An IPEP sets out both the projected energy demand for a region and the least-cost infrastructure pathway needed to meet it, including generation, storage, transmission and opportunities for industrial flexibility.
We modelled two pathways for a clean energy transition in Gladstone. In one, industries go at it independently, each building its own renewable generation, storage and supporting infrastructure. In the other, industries work together through shared infrastructure and orchestrated, flexible energy use. The difference is significant.
Our findings show that a clean energy transition (dark blue bar) can reduce electricity costs for industries compared to a business-as-usual grid (black bar) in Queensland. But when industries work together (light blue bar), these cost savings are even greater.

When industries coordinate by sharing infrastructure and using electricity more flexibly, the result is a smaller, smarter and cheaper clean energy system. The coordinated approach reduces both total system costs and electricity prices for industries by 20 per cent compared to an independent approach.
These savings are achieved by avoiding unnecessary infrastructure build-out, reducing the amount of solar capacity needed by 22 per cent, wind by 9 per cent and battery storage by 50 per cent. A coordinated build-out also means that what infrastructure is built is used more efficiently, with 40 per cent less electricity curtailed and wasted.
However, regardless of the approach taken, our modelling shows that the cost of firmed electricity under a clean energy transition can outcompete business-as-usual grid prices in Queensland from the early 2030s – saving industries up to 50 per cent in electricity prices.
For industry, the message is clear: waiting to transition could mean paying more for energy, while planning the transition together can reduce costs and provide greater certainty.
This is where IPEPs can play a critical role in supporting industries across Australia’s regions. It can potentially lower costs, provide greater investment certainty and ensure energy security. Accelerating this development, however, will require clear decisions on responsibility for the design and delivery. States and territories are well placed to lead the design of an IPEP methodology so that regional plans can be seamlessly integrated into national frameworks like the ISP.
Responsibility for the delivery of an IPEP may vary between regions. In Queensland, where the state government has called for the private sector to lead renewable infrastructure and investment, a representative body that brings together industry and community stakeholders in each industrial region could be one option for coordinating delivery.
While this issues paper focuses on Gladstone in Central Queensland, the principles of regional energy planning explored here can be applied across Australia’s industrial regions to support their continued competitiveness, resilience and prosperity. The opportunity is not simply to switch to clean energy. It’s to plan for it together – and to build it more efficiently, for a lower cost.